EN/中文
Start a project ↗
Large-diameter Shunfang water-transfer pipeline construction

Published project records

Project Achievements

Shunfang product and construction references organized by application, diameter and installation method.

Discuss a similar project

Overseas & export references

Overseas project references

Published Indonesia, Malaysia, Israel and Africa project information; specifications and installation scope are confirmed per project enquiry.

Offshore crane vessel lifting a pipe section for the Indonesia DN2400 seawater project

Completed aquaculture project · Indonesia

Indonesia DN2400 Seawater Circulation Project

A completed seawater-circulation project with 2 × 600 m runs of DN2400 pipe, rated at 1.0 MPa. Delivery included onshore prefabrication and marine float-out and positioning.

View project details →
Truck loaded with DN1800 structural-wall pipe leaving the factory for the Malaysia Ulu Tubai drainage project, carrying an SN16 project banner

Malaysia export · Ulu Tubai drainage

Malaysia Ulu Tubai Drainage Project

DN1800 spiral-wound structural-wall pipe, SN16, supplied for the Ulu Tubai drainage project in Malaysia for highway construction. Factory dispatch, container-port loading and SIRIM-certified pipes at the Malaysia site are recorded in project photos.

African customer delegation group photo with Shunfang staff at the large-diameter pipe factory

Overseas cooperation · Africa

Africa Water & Drainage Cooperation

An African customer delegation visiting the Shunfang factory to review large-diameter pipe production for water and drainage project cooperation, under international market development.

Israel customer inspecting the bore of a large-diameter blue marine pressure pipe at the Shunfang factory

Overseas project · Israel

Israel Marine High-Pressure Water Pipeline

A marine high-pressure water pipeline supplied for an Israel customer, published in the company project presentation under international market references. Photo shows the customer inspecting the large-diameter pipe bore at the factory.

Ulu Tubai evidence: dispatch to site

Large-diameter pipe being loaded at a container port for export to the Malaysia Ulu Tubai project
Container-port loading for export, May 2026
SIRIM-certified DN1800 pipes stockpiled at the Malaysia Ulu Tubai project site
SIRIM-certified DN1800 pipes at the Malaysia project site

Field references

Pipe systems in production, delivery and installation

Explore how Shunfang pipe systems have been manufactured, handled and installed across water-transfer, drainage and infrastructure projects.

DN630 pressure pipe prepared for pullback installation

Trenchless installation

DN630 Pressure Pipeline Pullback Installation

A published DN630 pressure-pipeline site reference showing the long pipe string prepared for pullback installation.

Trench installation of a DN500 water-supply pipeline

Water supply

DN500 Water-Supply Pipeline Construction

A DN500 water-supply construction reference illustrating on-site pipe handling and alignment.

DN1200 reinforced PE composite pipe installed in a trench

Buried drainage

DN1200 Reinforced PE Composite Pipe Installation

A documented DN1200 reinforced PE composite pipe installation in an excavated trench.

DN900 reinforced PE composite pipe installation reference

Pipeline construction

DN900 Reinforced PE Composite Pipe Site

A published DN900 site reference for Shunfang reinforced PE composite pipe.

Pipe materials for a Jinan sewer and stormwater separation project

Municipal drainage

Jinan Sewer and Stormwater Separation Project

A municipal sewer and stormwater separation reference in Jinan included in the official project archive.

Large-diameter Shunfang water-transfer pipeline under construction

Water transfer

Large-Diameter Water-Transfer Pipeline

A large-diameter water-transfer project showing lifting, alignment and field assembly of long pipe sections.

Water-supply record

Water-supply composite-pipe project table

Selected water-supply projects.

Guizhou rural water-supply project reference

Water-supply case

Guizhou rural water-supply integration

DN700 · 0.8 MPa · 12 km

Guan County water project reference

Water-supply case

Guan County 2021 comprehensive treatment project

DN1400 · 1.0 MPa

Datong water-supply project reference

Water-supply case

Datong water-supply project

DN500 · 1.0 MPa · 40 km

Hunan rural water-supply project reference

Water-supply case

Hunan rural water-supply integration

DN600 · 1.0/1.6 MPa · 25 km

Beijing residential water pipeline reference

Water-supply case

Beijing residential water pipeline

DN315 · 1.6 MPa · 50 km

Fengdu water-supply project reference

Water-supply case

Fengdu water-supply line

DN1000 · 1.25 MPa · 20 km

Congjiang water-supply project reference

Water-supply case

Congjiang Luoguan water line

DN1000 · 1.6 MPa · 30 km

Sichuan water-supply project reference

Water-supply case

Sichuan water-supply pipeline

DN1000/DN600 · 1.0 MPa · 18 km

Beijing Fangshan water-supply project reference

Water-supply case

Beijing Fangshan water line

DN315/DN400 · 1.6 MPa · 80 km

ProjectLocationSpecification
Guizhou rural water-supply integrationGuizhouDN700 · 0.8 MPa · 12 km
Guan County 2021 comprehensive treatment projectLiaocheng, ShandongDN1400 · 1.0 MPa
Datong water-supply projectDatong, ShanxiDN500 · 1.0 MPa · 40 km
Hunan rural water-supply integrationHunanDN600 · 1.0/1.6 MPa · 25 km
Beijing residential water pipelineBeijingDN315 · 1.6 MPa · 50 km
Fengdu water-supply lineFengdu, ChongqingDN1000 · 1.25 MPa · 20 km
Congjiang Luoguan water lineCongjiang, GuizhouDN1000 · 1.6 MPa · 30 km
Shanxi coal-mine water supplyShanxiDN400 · 1.0 MPa · 60 km
Sichuan water-supply pipelineSichuanDN1000/DN600 · 1.0 MPa · 18 km
Beijing Fangshan water lineFangshan, BeijingDN315/DN400 · 1.6 MPa · 80 km
Hebei water-supply projectHebeiDN315 · 1.0 MPa · 30 km
Shanxi water-supply projectShanxiDN315 · 1.0 MPa · 50 km
Linyi No.2 Reservoir water lineDezhou, ShandongDN800/DN900 · 1.0/1.6 MPa · 43 km
Mianyang Xinyong water transferMianyang, SichuanDN200 · 1.6 MPa · 20 km
Hebei contract water-saving projectHebeiDN160 · 1.6 MPa · 15 km
Zhangqiu Yunhu water plant, phase 1Jinan, ShandongDN315–DN800 · 1.0/2.0 MPa · 20 km
Chiping water-source replacementLiaocheng, ShandongDN630 · 1.6 MPa · 5.5 km

Drainage record

Drainage composite-pipe project table

Selected drainage projects, including combined water and drainage works.

Chiping water-source replacement project reference

Drainage case

Chiping water-source replacement

DN630

Zhangqiu water plant project reference

Drainage case

Zhangqiu Yunhu water plant, section 1

DN315–DN630

Jinan sewer and stormwater separation project reference

Drainage case

Jinan 2022 sewer-stormwater separation

DN300–DN600 · SN12.5 · 30 km

Shenxian wastewater treatment plant supporting network reference

Drainage case

Shenxian WWTP supporting networks

DN600–DN1500 · 1.0/1.6 MPa · 9 km

Tashan South Road structured-wall pipe project reference

Drainage case

Tashan South Road Type-A pipe supply

DN400–DN1400

Rizhao Port drainage project reference

Drainage case

Rizhao Port project

DN1600

Shijiazhuang north drainage retrofit reference

Drainage case

Shijiazhuang north drainage retrofit

DN2600

Dongying Port large-diameter pipeline project reference

Drainage case

Dongying Port project

DN1500–DN2000

Linyi No.2 Reservoir pipeline project reference

Drainage case

Linyi No.2 Reservoir water line

DN800–DN900

ProjectLocationSpecification
Chiping water-source replacementLiaocheng, ShandongDN630
Shenxian WWTP supporting networksLiaocheng, ShandongDN630/DN800
Zhangqiu Yunhu water plant, section 1Jinan, ShandongDN315–DN630
Zhangqiu Yunhu water plant, section 4Jinan, ShandongDN630–DN800
Linyi No.2 Reservoir water lineDezhou, ShandongDN800–DN900
Guan County 2021 groundwater over-extraction projectLiaocheng, ShandongDN1400
Linyi Kaiyuan water projectDezhou, ShandongDN110–DN400
Shandong Yixuan Paper plant worksDezhou, ShandongDN400
Jinan 2022 sewer-stormwater separationJinan, ShandongDN300–DN600
Jinan 2022 sewer-stormwater separationJinan, ShandongDN300–DN600 · SN12.5 · 30 km
Tao-Ge (Wujin) water environment, phase 3Changzhou, JiangsuDN300
Laiwu urban drainage phase 1, JinanJinan, ShandongDN200–DN1000
Shenxian WWTP supporting networksLiaocheng, ShandongDN300–DN1500
Shenxian WWTP supporting networksLiaocheng, ShandongDN600–DN1500 · 1.0/1.6 MPa · 9 km
Shandong Luqiao Heze constructionHeze, ShandongDN500–DN800
Juye black-water treatment and separationHeze, ShandongDN300–DN1000
Lincheng development-zone infrastructure upgradeXingtai, HebeiDN300–DN1000
Rizhao Port projectRizhao, ShandongDN1600
Xi’an Chuanze industrial projectJinan, ShandongDN400–DN1500
Chiping Zaoxiang Street separation retrofitLiaocheng, ShandongDN300–DN1500
Mengsu zero-carbon park WWTP and reuseOrdos, Inner MongoliaDN200–DN1000
Jinan Innovation Valley river trainingJinan, ShandongDN500–DN800
Shanghe water constructionJinan, ShandongDN300–DN800
Jinan Yellow River road-bridge groupJinan, ShandongDN200–DN300
Cui Zhai South municipal roads, phase 1Jinan, ShandongDN400
Changdao roads and networks overhaulYantai, ShandongDN400–DN500
Zhaoyuan Jinquan River separation retrofitYantai, ShandongDN600–DN1200
Zhoukou new-district roads and networksZhoukou, HenanDN400–DN1000
Zhoukou port and logistics park PPP, phase 1Zhoukou, HenanDN300–DN1500
Mandula Port networksBaotou, Inner MongoliaDN500
Yunzhong Avenue projectOrdos, Inner MongoliaDN700–DN1400
Beijing No.10 School Huaishuling drainageBeijingDN400–DN1000
Arxan wetland park pipelinesArxan, Inner MongoliaDN600
Chifeng Hongshan WWTP road wideningChifeng, Inner MongoliaDN500–DN800
Huai’an Yunlin Road worksHuai’an, JiangsuDN300–DN1500
Qinghe Binjiang Avenue, section 2Huai’an, JiangsuDN300–DN800
Fugou Tongqiu Road rain-sewage worksZhoukou, HenanDN1200–DN1500
Jincheng Wenbo Road, phase 2Jincheng, ShanxiDN1400
Weifang Kuiwen roads retrofitWeifang, ShandongDN300–DN600
Tashan South Road Type-A pipe supplyYantai, ShandongDN400–DN1400
Yinan rain-sewage separationLinyi, ShandongDN300–DN700
Linquan Xingquan Avenue municipal roadsFuyang, AnhuiDN300–DN1000
Yinchuan Hedong Airport projectYinchuan, NingxiaDN300–DN1200
Taikang Jiaotong Road sewer networksZhoukou, HenanDN500–DN800
Zhoukou Jiaotong Road drainageZhoukou, HenanDN500–DN800
Huai’an Jingyuan Road worksHuai’an, JiangsuDN400–DN500
Dongying Port projectDongying, ShandongDN1500–DN2000
Zhoukou Hanyang North and Huanghe–Zhongyuan linksZhoukou, HenanDN400–DN800
Shijiazhuang bonded-zone roadsShijiazhuang, HebeiDN1200
Yinchuan Airport phase-3 networksYinchuan, NingxiaDN300–DN1800
Shijiazhuang airport-park drainageShijiazhuang, HebeiDN300–DN1200
Pingbao Road realignmentPingdingshan, HenanDN1200
Jincheng Taihang Road networksJincheng, ShanxiDN300–DN1100
Rizhao Port west-harbour projectRizhao, ShandongDN1600
Huai’an Xuliu park infrastructureHuai’an, JiangsuDN400–DN600
Bayannur west-district networksBayannur, Inner MongoliaDN700–DN1400
Linfen Yaodu east-ring wideningLinfen, ShanxiDN300–DN1000
Kaifeng Peking University Resources TownKaifeng, HenanDN300–DN1800
Zhoukou east-ring, section 3Zhoukou, HenanDN300–DN700
Liaocheng north-ring drainageLiaocheng, ShandongDN500–DN2000
Harbour Construction west phase 4Rizhao, ShandongDN200–DN1500
Shijiazhuang north drainage retrofitShijiazhuang, HebeiDN2600
Pingdingshan Zhanhe treatment projectPingdingshan, HenanDN1800
Tongliao Huolinhe Avenue sewer installationTongliao, Inner MongoliaDN1500
Yinan Aucma Avenue sewer networksLinyi, ShandongDN400–DN1000
Beigou No.2 WWTP pipe supplyYantai, ShandongDN600–DN800
Yuncheng high-speed-rail business-district roadsYuncheng, ShanxiDN300–DN1200
Shenhua Huanghua Port drainage retrofitHuanghua, HebeiDN300–DN1800
Provincial culture and arts centreJinan, ShandongDN1500–DN2400
Dezhou Qiaokou Haizi drainage retrofitDezhou, ShandongDN1200–DN1600
Shouguang Zikang Road drainageWeifang, ShandongDN800–DN1000
Xuanhua Xingfu Avenue drainageZhangjiakou, HebeiDN600
Hanggin Banner old-town renewalOrdos, Inner MongoliaDN300–DN1200
Wugang business-service-zone sewagePingdingshan, HenanDN400–DN800
Taiyuan Zhengyang Street drainageTaiyuan, ShanxiDN400–DN700
Linyi Lingang development-zone sewer networksLinyi, ShandongDN400–DN800
Hohhot east-station district drainageHohhot, Inner MongoliaDN300–DN700
Taiyuan Dachang Road retrofitTaiyuan, ShanxiDN1000
Jinan high-tech-zone Roads 34 and 35Jinan, ShandongDN400–DN500
Linyi Xi’an Road HDPE drainage supplyLinyi, ShandongDN400–DN600
Jinan Gongye North Road drainageJinan, ShandongDN500
Tai’an Lingshan Avenue mid-sectionTai’an, ShandongDN500–DN800
Chiping Jianshe Road retrofitLiaocheng, ShandongDN1000–DN1500
West Ujimqin Baiyinhua logistics parkChifeng, Inner MongoliaDN400–DN500
Hohhot Jinshan development-zone projectHohhot, Inner MongoliaDN800–DN1000
Dalian Puwan roads and networksDalian, LiaoningDN400–DN600
Jiqi Road retrofit worksJinan, ShandongDN600–DN1000
Hohhot Jinqiao WWTP networks, lot AHohhot, Inner MongoliaDN600–DN1400
Kaifeng Qixian Chengdong Road stormwaterKaifeng, HenanDN600–DN1200
Shengle park Jing’er Road south sectionHohhot, Inner MongoliaDN400
PetroChina Qilu power-plant retrofitZibo, ShandongDN300–DN1200
Weifang Kuiwen comprehensive retrofitWeifang, ShandongDN500–DN1000
Dongying eco-industrial-park drainageDongying, ShandongDN400
Zhengzhou Hongri Road sewageZhengzhou, HenanDN500–DN600
Zhongmu Yanming Avenue sewer networksZhengzhou, HenanDN400–DN500
Lianyungang Zong’er Road worksLianyungang, JiangsuDN300–DN1000
Jinan river separation, Lixia section supplyJinan, ShandongDN500–DN600
Fengtai Kangxin Road projectBeijingDN1200
Tancheng WWTP HDPE networks supplyLinyi, ShandongDN400–DN500
Dongguan Apollo water-storage projectDongguan, GuangdongDN2400 · SN12.5

Pressure test

DN560 pressure-pipe test reference

The DN560 test record states a 1.6 MPa design pressure, pressure holding at 2.4 MPa for 118 hours and a maximum test pressure of 3.4 MPa.

Ratings for other diameters and configurations follow their applicable technical specification.

Review HDPE Pressure Pipe
DN560 Shunfang pressure-pipe test reference

Planning a related project?

Send the medium, diameter, pressure or ring stiffness, route, connection preference, quantity, location and schedule for a focused review.

Request technical review

PROJECT ENQUIRY

Put the difficult pipe on the table.

Application · medium · diameter · pressure or ring stiffness · quantity · destination

Discuss your project →
◉WhatsApp MichaelQuick project enquiry