Pipe, fitting and connection are selected as one engineering system. The jointing method depends on pipe construction, diameter, pressure or sealing duty, access, equipment and the approved field procedure.

Large PE pipe fitting and connection interface
Connection interfaceFabricated PE fittingProject-specific configuration
SF / 01
01 PIPE

Confirm pressure or gravity duty, wall construction, material and diameter.

02 JOINT

Match the connection to structural demand, sealing duty, field access and equipment.

03 PROCEDURE

Use the applicable installation, inspection and acceptance procedure for the confirmed configuration.

Different products use
different connections.

These photos and diagrams show the connection routes, not a universal joint specification. Confirm compatibility and the approved installation procedure for the selected pipe.

Large pipe sections positioned in butt-fusion clamping equipment
Butt-fusion equipment · on-site installation
01 THERMAL FUSION

Butt Fusion

Review material, wall configuration, machine range, alignment, heating and pressure-control requirements.

Electrofusion coupling sleeve shown in the supplied project presentationElectrofusion coupling section diagram showing the heating-wire zone
Coupling sleeve + section diagram · supplied PPT
02 ELECTROFUSION

Electrofusion Coupling

Confirm diameter, pressure class, preparation, installation clearance and fusion parameters.

Orange electrofusion band secured around a structured-wall pipe in a trenchCompleted electrofusion band joint on structured-wall pipe
External band during trench installation
03 ELECTROFUSION

Electrofusion Band Joint

An external electrofusion band for compatible structured-wall pipe joints. Confirm the approved joint design and installation procedure.

Spigot-and-socket joint with two sealing rings
Double-seal socket joint · sealing-ring arrangement
04 MECHANICAL SEAL

Spigot-and-Socket Joint with Two Sealing Rings

Review watertightness, insertion depth, angular deflection, bedding and field installation procedure.

Large reinforced PE pipe with a bolted flange plate
Bolted flange assembly · pipe interface
05 INTERFACE

Flanged Joint

For valves, equipment and transitions where pressure, bolts, backing rings and gaskets are coordinated.

Technicians performing extrusion welding on a large PE pipe joint
PE extrusion welding · pipe fabrication
06 FABRICATION

Extrusion Welding

Used for applicable fabrication and non-pressure structural work under an approved procedure.

Complete the pipe system,
not only the straight pipe.

Project scope may include bends, tees, reducers, branches, flanged transitions, manholes or chambers where manufacturing capability and design information are confirmed.

Fabricated PE pipe fitting
01 / FACTORYFabricated fitting reference
Worker checking the inside of a large pipe during joint preparation
02 / INSPECTIONInternal joint preparation
Large PE pipe connection work at the project site
03 / SITESite connection reference

Send the pipe and
site conditions together.

Product, diameter, pressure or sealing duty, joint quantity, working space, power, equipment, drawings, inspection and destination.

PROJECT ENQUIRY

Put the difficult pipe on the table.

Application · medium · diameter · pressure or ring stiffness · quantity · destination

Discuss your project →
◉WhatsApp MichaelQuick project enquiry